Project Management

Developing the Scope Statement and Project Plan

 

 

                        Developing a Project Scope Statement

 

The project scope statement is the definition of the project—what needs to be accomplished. The Develop Preliminary Project Scope Statement process addresses and documents the characteristics and boundaries of the project and its associated products and services, as well as the methods of acceptance and scope control. A project scope statement includes:

 

·         Project and product objectives

·         Product or service requirements and characteristics

·         Product acceptance criteria

·         Project boundaries

·         Project requirements and deliverables

·         Project constraints

·         Project assumptions

·         Initial project organization

·         Initial defined risks

·         Schedule milestones

·         Initial WBS

·         Order of magnitude cost estimate

·         Project configuration management requirements

·         Approval requirements

 

The preliminary project scope statement is developed from information provided by the initiator or sponsor. The project management team in the Scope Definition process further refines the preliminary project scope statement into the project scope statement. The project scope statement content will vary depending upon the application area and complexity of the project and can include some or all of the components identified above. During subsequent phases of multi-phase projects, the Develop Preliminary Project Scope Statement process validates and refines, if required, the project scope defined for that phase.

 

Project Scope Development Tools and Techniques

1 – Project Management Methodology

The project management methodology defines a process that aids a project  management team in developing and controlling changes to the preliminary project scope statement.

 

2 – Project Management Information System

The project management information system, an automated system, is used by the project management team to support generation of a preliminary project scope statement, facilitate feedback as the document is refined, control changes to the project scope statement, and release the approved document.

 

3 – Expert Judgment

Expert judgment is applied to any technical and management details to be included in the preliminary project scope statement.

         

Develop Project Plan

 

The Develop Project Management Plan process includes the actions necessary to define, integrate, and coordinate all subsidiary plans into a project management plan. The project management plan content will vary depending upon the application area and complexity of the project. This process results in a project management plan that is updated and revised through the Integrated Change Control process. The project management plan defines how the project is executed, monitored and controlled, and closed. The project management plan documents the collection of outputs of the planning processes of the Planning Process Group and includes:

 

·         The project management processes selected by the project management team

·         The level of implementation of each selected process

·         The descriptions of the tools and techniques to be used for accomplishing those processes

·         How the selected processes will be used to manage the specific project, including the dependencies and interactions among those processes, and the essential inputs and outputs

·         How work will be executed to accomplish the project objectives

·         How changes will be monitored and controlled

·         How configuration management will be performed

·         How integrity of the performance measurement baselines will be maintained and used

·         The need and techniques for communication among stakeholders

·         The selected project life cycle and, for multi-phase projects, the associated project phases

·         Key management reviews for content, extent, and timing to facilitate addressing open issues and pending decisions.

 

The project management plan can be either summary level or detailed, and can be composed of one or more subsidiary plans and other components. Each of the subsidiary plans and components is detailed to the extent required by the specific project. These subsidiary plans include, but are not limited to:

 

·         Project scope management plan

·         Schedule management plan

·         Cost management plan

·         Quality management plan

·         Process improvement plan

·         Staffing management plan

·         Communication management plan

·         Risk management plan

·         Procurement management plan

 

These other components include, but are not limited to:

 

·         Milestone list

·         Resource calendar

·         Schedule baseline

·         Cost baseline

·         Quality baseline

·         Risk register

 

          Project Plan Tools and Techniques

Project Management Methodology

The project management methodology defines a process, which aids a project management team in developing and controlling changes to the project management plan.

 

Project Management Information System

The project management information system, an automated system, is used by the project management team to support generation of the project management plan, facilitate feedback as the document is developed, control changes to the project management plan, and release the approved document.

 

·         Configuration Management System The configuration management system is a subsystem of the overall project management information system. The system includes the process for submitting proposed changes, tracking systems for reviewing and approving proposed changes, defining approval levels for authorizing changes, and providing a method to validate approved changes. In most application areas, the configuration management system includes the change control system. The configuration management system is also a collection of formal documented procedures used to apply technical and administrative direction and surveillance to:

o   Identify and document the functional and physical characteristics of a product or component

o   Control any changes to such characteristics

o   Record and report each change and its implementation status

o   Support the audit of the products or components to verify conformance to requirements.

 

·         Change Control System The change control system is a collection of formal documented procedures that define how project deliverables and documentation are controlled, changed, and approved. The change control system is a subsystem of the configuration management system. For example, for information technology systems, a change control system can include the specifications (scripts, source code, data definition language, etc.) for each software component.

 

·         Expert Judgment Expert judgment is applied to develop technical and management details to be included in the project management plan.

 

 

 


[i] A Guide to the Project Management Body of Knowledge (PMBOK® Guide) Third Edition

2004 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA

November 19, 2008 Posted by | knowledge areas, PMP, Project Management | | 2 Comments